The Subak II construction is coming long well
The Subak II wirkshop in Port Adelaide is running well. We hd an interview with Tim Brunnero on Radio Adelaide, the hull has been repaired, the mast and sail constructed.Details on the CoC Blog over at TUBA: http://coc.timesup.org
References:
Call for Participation Control of Commons
References:
CoC - Workshop 03
References:
Control of the Commons
References:
Resilient Structures
References:
RESILIENTS
References:
Time's Up Boating Association