Leo

Schatzl

Data 8/9

Chronology of events 1
Experiment phase 1: August 03 - 09 1998
* 03.-05.08.1998:
The construction of an excenter motor to vibrate heay objects and body parts. Finished and tested on Tuesday, 5th
Test: self-test with body vibration
ANIMS: mota1.gif
..........................................................................................................
* 06.08.1998:
Construction of an "image shaker" (mechanical set-up to vibrate images) Guideline: semi-strong vibrations on one level (motion of images ~ +/- 3 mm).
Test: the distribution of the vibration is wrong, the planned carrier of the image rotates in all directions; propable cause: wrong placement of the excenter as well as of the image mounting point
[ JPEGS: all3.JPG ]
...........................................................................................................
* 07.08.1998:
Reconstruction of the "image shaker", change of placement of motors as well as image mounting point.
o Test 0:
Test set up:
> "Image shaker"
> Testimage (small photography with strong contrast against a monochrom background (Mickymouse/Castle, Textstructur e>
> 1 Stroboscope (no color filters)
Observation of the effects of various vibration frequencies between an image and the strobe.
The image seems to move the impression "almost" 3-D.
[ JPEGS: mouse1.JPG, mouse2.JPG, text.JPG
ANIMS: micka1.gif, texta1.gif
MOVIES: mickey1.movie,mickey2.movie, mickey3.movie, text1.movie, text2.movie ]
........................................................................